Attention all residents | Approval for conversion is required by both EE and Squires Bluff - A ACR submission to Squires Bluff will get your request handled. No Installing contractor can get your request approved!

Lamp conversions for 2009 have started for those who signed up at last Decembers Annual Meeting. So if you "wonder what all the colors and flags are on the lawns". Those are utility markings for the installer to dig.

Remember an Online ACR is still required for the Post Lamp coversion of gas-to-electric.

The Squires Bluff Board has voted to approve conversion of Post Lamps in our development and comply with Eaton Estate rules.

  • Post Lamps may be powered by either low voltage electricity or natural gas and shall be maintained in working condition by the Lot or Owner.

  • The recommendation is to follow the Eaton Estate Standard to provide consistence throughout the development and maintain the present architectural look.

  • The residents are responsible for the cost to convert and maintain the post lamps.  All repairs to the property resulting from the installation of this change are to be the responsibility of the Owner or occupant.

  • Construction – The conversion must not change the present exterior look and be at least equal to in quality of workmanship, details, and finish.

  • Board member in charge please contact John Debelak for additional details 330.908.1095

Post Lamp

An on-line Architectural Change Request is required for compliance with our Declaration and subject to board approval, to allow Owners to convert existing natural gas powered Post Lamps to low voltage electric Post Lamps.

Architectural Changes
Changes that are being planned to the exterior of your property or common area require approval by the Board. No exceptions. If you want to know how to request to make a change or to find out about current change requests status, go to the Squire’s Bluff website. From the homepage, select “Architectural” or "ACR Status". You can also contact Aries Management or a board member.

Current vendor for Gas Light conversion Charm-Lite  product. click on photo to en-large
This page was last updated: August 22, 2010
All Gas Light Lamp Post Conversion require an Architectural Change Request be submitted | The ACR can be an online submission to Squires Bluff Board members.  EE requires an approval process be applied to confirm approval of conversion. Anyone installing a lamp conversion with out an Squires Bluff ACR approval may be subject to EE fine | for light being inoperable during a daytime inspection. We are submitting the request for the residents to EE as a blanket approval if on our list.